Water pipeline laying — open trench & trenchless

From 40 mm service connections to 4000 mm trunk mains. Where open cut isn't possible, our HDD and jack-pushing rigs cross railways, highways, expressways and canals without breaking the surface.

40 mm – 4000 mm dia

Open Trench

Conventional open-cut pipeline laying across the full diameter range. Trench excavation, bedding, pipe laying, jointing, hydro testing and backfilling — executed with our own excavation fleet and permanent crews.

  • Full diameter range: 40 mm to 4000 mm
  • Excavation, bedding, laying and jointing
  • Hydro testing and controlled backfilling
  • Executed with owned JCB / excavation machinery
40 mm – 500 mm dia · all soil & hard rock

Trenchless — HDD Machine Work

Horizontal Directional Drilling for crossings beneath railways, national highways, expressways and canals — with zero disruption to the surface asset above. Suited to both all-soil and hard-rock conditions.

  • Diameter range: 40 mm to 500 mm
  • All soil and hard rock capability
  • Railway, NH, expressway and canal crossings
  • RDSO-compliant M.S. casing with carrier pipe pulling
40 mm – 4000 mm dia · all soil & hard rock

Trenchless — Jack Pushing Work

Pipe jacking / jack pushing for large-diameter trenchless crossings where open cut is not permitted. Handles the full 40 mm–4000 mm range in mixed soil and hard rock.

  • Diameter range: 40 mm to 4000 mm
  • All soil and hard rock capability
  • Large-diameter casing installation
  • Ideal where surface disruption is prohibited